PENILAIAN RISIKO LINGKUNGAN DAN INVESTASI PADA PERENCANAAN PELABUHAN KIJING, KALIMANTAN BARAT

Authors

  • Adhitya Reddia Prabowomukti Indonesia Banking School
  • Muchlis Muchlis Indonesia Banking School

Keywords:

port of Kijing, environmental risk, investment risk, internal rate of return, net present value

Abstract

This study aims to identify environmental risks and assess the investment risk of the Port of Kijing. Data collection techniques in this study by conducting a field survey to PT. Pelabuhan Indonesia II branch office in Pontianak, surveying the conditions of meterology and oceanography in the Kijing area and also along the Kapuas River from upstream to downstream to find out the barge connectivity path. The next method is to conduct in-depth interviews with the Head of the Port of Pontianak, several shipping companies (ship logistics companies) and also Crude Palm Oil (CPO) producers related to throughput and ship traffic in Kalimantan. Based on the results of the study it can be concluded as follows: 1)The most common environmental risk events that occur are increasing noise and pollution around the port construction area. The highest level of risk that could potentially be fatal, or extreme risk, namely when the ship collided or touched. While the lowest risk level is if the terminal processing is delayed, 2) The overall investment risk assessment shows that the Kijing Port project has high potential in profitability and healthy cash flow performance, indicated by an Internal Rate of Return (IRR)of 13.3% and a positive Net Present Value (NPV) on a discount rate of 12%, so this investment is considered feasible.

References

Anonymous. (2013). A guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute. Five Edition.

Aryati, Indah Kusumastuti. (2004). Pengaruh Kualitas Komunikasi Pada Pengelolaan Proyek Konstruksi Bangunan Gedung Terhadap Kinerja Waktu. Tesis. Program Pasca Sarjana Fakultas Teknik UI. Depok.

Burns, M.G. (2015). Port Management and Operations. New York: CRC Press.

Burtonshaw-Gunn, Simon A. (2011). Alat dan Teknik Analisis Manajemen. Indeks. Jakarta.

Chrismawan. (2011). Peranan Konsultan Manajemen Konstruksi Pada Pelaksanaan Bangunan Gedung Bertingkat. Jurnal Manajemen Konstruksi. Diakses 8 Maret 2013, dari: http://repository.maranatha.edu/id/eprint/2772

Clough, Richard H. dan Glenn A. Scars. (1991). Construction Project Management. Canada: John Willey & Sons Inc.

Dana, Persada Mulyoto dan Sartika Kurniali. (2013). Super Project Manager. Penerbit Elex Media Komputindo.

Dekker, Sander. (2005). Port Investment Towards an Integrated Planning of Port Capacity. Delft University Thesis. Delft, Netherlands.

Heizer, J dan Barry Render. (2005). Manajemen Operasi. Terjemahan. Edisi ketujuh. Penerbit Salemba Empat. Jakarta.

Husein, Abrar. (2010). Manajemen Proyek. Penerbit Andi.Yogyakarta.

I. Dipohusodo. (1996). Manajemen Proyek Konstruksi. Jilid 1. Yogyakarta. Idzurnida.

Kamaruzzaman, Findy. (2010). Studi Keterlambatan Penyelesaian Proyek Konstruksi Jalan Beton di Kota Pontianak. Jurnal Manajemen Konstruksi. Diakses Desember 2012, dari: https://docplayer.info/33844294-Studi- keterlambatan-penyelesaian-proyek-konstruksi- study-of-delay-in-the-completion-of- construction-projects.html

Kerzner H. (2001). Project Management. Seventh Edition. John Wiley & Sons, Inc. New York.

Kramadibrata Soedjono. (1995). Perencanaan Pelabuhan. Ganeca Exact. Bandung.

Marsh. (2014). Ports and Terminals Risk Challenges and Solutions. Journal Global Infrastructure and Marine. New York, USA.

Navarackas, Justas. (2017). Port of Klaipeda Risk Assessment Concerning Safety of Marine Operations. Aalborg Universitet Risk and Safety Management Thesis. Esbjerg, Denmark.

Ndlozi, Malibongwe Theopilus. (2016). Port Investment Risk: Qualitative Review of South African Port Investment Valuation Framework. World Maritime University Dissertations. Malmo, Sweden.

Port & Marine Engineering Consultant, BMT. (2014). Detailed Feasibility and Outline Design of Kijing Deepwater Port. Kijing, West Kalimantan. Smith, Karl A. ( 2000). Project Management and Teamwork. McGraw-Hill Inc. Minnesota.

Soeharto I. (1995). Manajemen Proyek dari konseptual sampai operasional. Erlangga. Jakarta.

Triatmodjo, Bambang. (1999). Perencanaan Pelabuhan. Yogyakarta: Beta Offset Yogyakarta. United Nations Conference on Trade and Development (UNCTAD). (1978). Port Development. United Nations. New York.

Widiasanti, Irika dan Lenggogeni. (2013). Manajemen Konstruksi. Penerbit Rosdakarya. Bandung.

Downloads

Published

2024-12-12
Abstract Views: 5 | File Downloads: 1